David
Andrews
RV8
Project
Rockhampton
Qld
Work completed includes:
-tail group complete
-wings complete, and tanks
etc.
-fuselage and canopy (canopy
not yet finally bolted on, but fitted)
-instrument panel (but no
electrics done yet)
-u/carriage
-cowls
-Engine plumbing
-all electrical, , although
battery and battery case is mounted and main cables run
-fit air intake and filter
etc.
-spinner
-final rivet on of canopy
-final various fairings
-balance control surfaces
etc.
-creature comforts in cabin
area, although intend to keep it fairly modest (spartan)
- hell, still a lot to
do!!!!!
Still enjoying the experience, but this
summer was a killer in the 'shed", we have had about 4 weeks of 40
degree plus, and high humidity days starting Xmas week, that was tough
going, and nights..unable to open the shed door, or the mozzies would eat
you alive...
David Paynter, Brisbane Aero Engineers
doing engine work/and advices
Fred Clej contributed instrument work/advice
etc.
Kevin Hasse has done my inspections to date,
(under the 'old system", and hopefully he will be generous enough to do
the Final as well.
Due to the Authority, not seeming to be
interested in processing my application for an ABAA, it appears that I will
have to 'GO EXPERIMENTAL", what the heck, as long as I get to fly the
thing.

Mid Fuselage section with
canopy being fitted

Instrumentation Panel &
Roll Bar

Firewall Forward Cowl &
Hartzell C/S Propeller